We completed the production, delivery, and installation of a 7.5-meter acrylic glass panel in a modern stainless steel swimming pool. Świeradów-Zdrój, scheduled for completion in 2024. The biggest challenge was the installation inside the large hall, which was already completely finished after the modernization of the old facility – the installed windows and doors prevented the use of standard lifting equipment. The transportation and loading of the large-scale glass pane was accomplished using specialized trolleys, lifts, and teamwork. The entire process was carried out with the utmost precision and safety. Scope of implementation: